← Back to library
Oil & Gas
Template
Hot Work & Fire Watch Checklist
Authorise hot work with our Hot Work & Fire Watch Checklist. Designed for permit issuers and fire watch, this template covers gas tests, combustibles, fire watch, and post-work checks.
Hot work fires start in the 30 minutes after the job. This checklist covers before, during, and after.
What is included
Pre-work Controls:
- Permit, gas tests, combustibles removed or covered
- Extinguishers and fire watch named
During & After:
- Watch maintained
- Post-work inspection and close-out
Using this template allows you to:
- Standardise hot-work controls
- Name the fire watch
- Close out after the last spark
Disclaimer: This template is provided as a guidance tool only. All inspections and follow-up actions must be carried out in line with your organisation’s procedures and local health and safety regulations. We do not accept responsibility for how this checklist is used.
Download the Hot Work & Fire Watch Checklist today to control hot work from gas test to fire watch.
